日韩一区二区精品网站,国产欧美日韩一区二区三区在线,韩国中文字幕三级精品久久,久久伊人69日韩精品

當(dāng)前位置:首頁(yè)   >    產(chǎn)品中心   >    萬(wàn)能試驗(yàn)機(jī)(拉力機(jī))   >    萬(wàn)能試驗(yàn)機(jī)   >   膠合板拉力試驗(yàn)機(jī)廠家 產(chǎn)品展示

膠合板拉力試驗(yàn)機(jī)廠家

型 號(hào)

更新時(shí)間2024-11-19

廠商性質(zhì)生產(chǎn)廠家

報(bào)價(jià)

產(chǎn)品描述:北京北廣精儀儀器有限公司是從事專業(yè)測(cè)量?jī)x器以及相關(guān)設(shè)備的研發(fā)、生產(chǎn)、銷售、于一體是股份企業(yè),并按照現(xiàn)代化經(jīng)營(yíng)管理實(shí)現(xiàn)企業(yè)化經(jīng)營(yíng)管理模式走向股份制正規(guī)化企業(yè),公司經(jīng)過(guò)長(zhǎng)期發(fā)展,現(xiàn)已擁有獨(dú)立的研發(fā)隊(duì)伍并已有海內(nèi)外專家入注進(jìn)行產(chǎn)品的研發(fā)與設(shè)計(jì)。

產(chǎn)品概述

膠合板拉力試驗(yàn)機(jī)故障及解決方法:
一、拉力試驗(yàn)機(jī)加荷時(shí),指針顫動(dòng)或時(shí)走時(shí)停
1、離合器齒輪磨損:需要修理或更換。
2、摩擦盤的皮墊圈或彈簧磨損:需更換皮墊圈或彈簧。
3、操縱手柄移位:調(diào)整操縱手柄,使其與牙槽配合好。
二、更換擺砣時(shí)指針不回零
1、拉力試驗(yàn)機(jī)安裝不水平:用水平儀把試驗(yàn)機(jī)調(diào)整水平。
2、擺錘不垂直:只掛A砣。調(diào)整平衡砣,使之垂直。
三、拉力試驗(yàn)機(jī)擺錘回位太快或太慢
1、緩沖閥擋位位置放置不當(dāng):調(diào)整緩沖閥到適當(dāng)位置。
2、液壓油黏度過(guò)低或過(guò)高:液壓油黏度過(guò)低時(shí)擺錘回落快,黏度高時(shí)回落慢.應(yīng)更換適當(dāng)黏度的液壓油。
3、緩沖閥內(nèi)、油管內(nèi)或液壓油有臟污:清洗緩沖閥、油管。更換液壓油。
四、拉力試驗(yàn)機(jī)指針回零滯怠或不穩(wěn)定
1、指針軸承、主軸軸承銹蝕或有油污:清洗或更換軸承。
2、齒桿變形或齒桿與齒輪不嚙合:校直齒桿或清洗、修整齒輪、槽輪等傳動(dòng)部件。
3、緩沖閥內(nèi)有臟污:清洗緩沖閥。
五、拉力試驗(yàn)機(jī)示值正偏差
1、短臂刀刃有松動(dòng):把刀刃緊牢。
2、擺砣偏輕:給砣配重(要兼顧A、B、C砣的重量)。
六、示值負(fù)偏差zui主要原因是各部件之間的摩擦阻力過(guò)大
1、指針軸承、擺軸軸承和測(cè)力傳動(dòng)部件摩擦阻力過(guò)大:主要是調(diào)整、清洗軸承及測(cè)力傳動(dòng)部件.消除不正常的摩擦阻力。
2、上夾頭、從動(dòng)針彈簧片松緊度和描繪裝置的摩擦阻力大:調(diào)整上夾頭、從動(dòng)針彈簧片松緊度和描繪裝置部件.消除不正常的摩擦阻力。
3、活塞桿與擺桿相接部位不靈活:調(diào)整兩者相接部位。使之靈活自如。
七、從動(dòng)針滯阻或移位
1、從動(dòng)針彈簧片彈力大小或從動(dòng)針與指示盤摩擦阻力大小造成的影響:調(diào)整從動(dòng)針彈簧片的彈力或從動(dòng)針與指示盤的問(wèn)隙。
2、從動(dòng)針兩端重鼉有偏差:調(diào)整兩端重量,使其平衡。
八、示值無(wú)規(guī)律的偏差
1、齒桿、齒輪有油污、磨損或有毛刺:消除齒桿、齒輪的油污、毛刺,找出超差時(shí)的齒桿接觸點(diǎn),然后修正齒桿、齒輪;如不能消除誤差.更換齒桿、齒輪。
2、拉力試驗(yàn)機(jī)試驗(yàn)機(jī)安裝不水平:調(diào)整水平。
3、齒桿彎曲:校直或更換齒桿,調(diào)整滾動(dòng)槽輪的問(wèn)隙。
九、計(jì)算機(jī)軟件聯(lián)機(jī)后出現(xiàn)提示框信息顯示超載。
解決方案是檢查計(jì)算機(jī)與試驗(yàn)機(jī)的通訊線是否脫落;檢查聯(lián)機(jī)選擇傳感器是否選擇正確;檢查zui近的試驗(yàn)或操作鍵
盤時(shí)傳感器是否被撞過(guò);檢查出現(xiàn)問(wèn)題之前是否使用了軟件的校準(zhǔn)或標(biāo)定功能;檢查是否手動(dòng)更改過(guò)校準(zhǔn)值、標(biāo)定值或硬件參數(shù)中的其他信息。
十、試驗(yàn)機(jī)主機(jī)電源不亮,不能上下移動(dòng)。
解決方案是檢查接入試驗(yàn)機(jī)的電源線路是否連接正常;檢查急停開關(guān)是否處于擰起狀態(tài);檢查接入試驗(yàn)機(jī)的電源電壓是否正常;檢查機(jī)器插座上的保險(xiǎn)是否燒斷,請(qǐng)取出備用保險(xiǎn)絲安裝即可。
十一、試驗(yàn)機(jī)主機(jī)電源有電但設(shè)備不可以上下移動(dòng)。
解決方案是檢查是否是15S(時(shí)間)以后設(shè)備還無(wú)法移動(dòng),因?yàn)橹鳈C(jī)開機(jī)需要自檢,大概需要15S時(shí)間;檢查上下限位是否再恰當(dāng)?shù)奈恢?,有一定的運(yùn)行空間;檢查接入試驗(yàn)機(jī)的電源電壓是否正常。

 

膠合板拉力試驗(yàn)機(jī)fault and solution method:

A, tensile test machine, vibration or pause the pointer
1, the clutch gear wear: the need for repair or replacement.
2, the skin friction disc washer or spring wear: need to change the skin or spring washer.
3, handle shift: to adjust the control handle, make it fit in with the alveolar.


Two, the replacement of pendulum weight when the pointer does not return to zero
1, tensile testing machine installation is not level: the level to adjust the level of test machine.
2, not only the vertical pendulum hanging weight: A. Adjust the balance weight, so that the vertical.

Three, tensile testing machine, the pendulum back a bit too fast or too slow
1, the buffer valve gear position placed improper: adjust the buffer valve to the appropriate location.
2, the hydraulic oil viscosity is too low or too high: hammer down fast swing hydraulic oil viscosity is too low, viscosity is high down slowly. Should be proper replacement of hydraulic oil viscosity.
Vittae 3, buffer valve, or hydraulic oil dirty: washing buffer valve, pipe. Replacement of hydraulic oil.


Four, tensile testing machine pointer back to zero lag or unstable
1, the pointer bearing, spindle bearing corrosion or oil: clean or replace bearing.
2, toothed bar deformation or toothed bar and gear is not engaged: straightening toothed bar or washing, dressing gear, wheel, transmission parts.
3, the buffer valve with cleaning: cleaning buffer valve.

Five, tensile testing machine showing the value of positive deviation
1, the short arm loose: the knife blade tightly.
2, swing weight lighter: give weight weight (both A, B, C weight weight).
Six, showing the value of negative deviation is the main reason of the frictional resistance between the units is too large

1, the pointer shaft bearing, bearing and power transmission parts friction resistance is too large: mainly adjustment, cleaning bearings and force transmission parts to eliminate the friction resistance is not normal.
Friction resistance on 2, chuck, driven needle leaf spring tightness and describe the adjustment device: chuck, driven needle leaf spring tightness and drawing device components. To eliminate the friction resistance is not normal.
3, the piston rod and the swing rod is connected with the flexible adjustment of both parts not connected parts. The flexible.


Seven, the driven needle stagnation or shift
Effect of 1, driven needle leaf spring elastic force or driven needle and dial friction resistance caused by the gap adjustment driven needle: the elasticity of the spring piece or driven needle and dial.
2, the driven needle are heavy alligator deviation: adjusting the weights, the balance.


Eight, showing the value of deviation is irregular
1, rack, gear oil, abrasion or burr: eliminate the rack, gear oil, burr, find out the pole difference when the contact points, and then modified tooth bar, gear; if not eliminate errors. Replace the tooth bar, gear.
2, tensile testing machine testing machine installation is not level: level adjustment.
3, toothed bar bending: alignment or replacement tooth bar, adjust the roll gap groove wheel.

Nine, computer software on-line prompt box display information overload.
The solution is to check the computer and test machine communication line is off; check the online selection of sensor is correct; check the last test or operation keys
When the sensor is knocked off; check whether the use of a software appears calibration or calibration before; check whether the manual modified calibration values, calibration information value or other hardware parameters in the.
Host ten, the power of the testing machine does not light, not to move up and down.
The solution is power line inspection access testing machine is connected properly; check the emergency stop switch is in screwed up state; power supply voltage check access testing machine is normal; check the socket on the insurance is burned off, remove the spare fuse can be installed.
Host eleven, testing machine power supply with power but the equipment can not move up and down.
The solution is to check whether it is 15S (time) after the device is unable to move, because the host boot take self-inspection, probably need 15S time; check the upper and lower limit is again appropriate position, operating space; check supply voltage access testing machine is normal.

留言框

  • 產(chǎn)品:

  • 您的單位:

  • 您的姓名:

  • 聯(lián)系電話:

  • 常用郵箱:

  • 省份:

  • 詳細(xì)地址:

  • 補(bǔ)充說(shuō)明:

  • 驗(yàn)證碼:

    請(qǐng)輸入計(jì)算結(jié)果(填寫阿拉伯?dāng)?shù)字),如:三加四=7
聯(lián)系人:陳丹
手機(jī):
18911395947
點(diǎn)擊這里給我發(fā)消息
 
国产精品熟女视频播放| 欧美成人精品一区二区免费看| 99热这里有精品在线观看| 操大屌粉的小穴视频| 国产一区二区三区精品片| 看小伙草白女人比的黄片| 日韩美女黄大片在线观看| 美女亚洲福利视频| 国产精品你懂的在线资源| 国产一区二区三区午夜精品久久| 使劲操大骚逼av| 欧美日韩一区精品一区精品| 大鸡巴日小美女明星的BB| 日韩精品诱惑一区?区三区| 黑人妖大鸡吧操逼| 激情久久久久久久久久久| 欧美日韩视频在线一区二区| 日本公共厕所mmm撒尿| 久久久久久久久中文字幕| 尤物网三级在线观看| 国产亚洲精品高清视频免费| 国产精品久久久久妇| 高清国产一区二区| 女女同性女同1区二区三| 久久久久精品无码专区喝奶| 国产一区曰韩二区欧美三区| 日本高清一区二区三区在线观看| 夜色成人免费观看| 日韩一区二区三区国色天香| 韩国女主播一区二区视频| 中文字幕国产精品一区二区三区| 老色鬼精品视频二区三区| 天美传媒精品1区2区3区| 操的我的逼逼好爽好多水| 欧美 日韩 激情 在线| 美国毛片亚洲社区成人看| 欧美人人做人人爽人人喊| 色综合色狠狠天天综合色| 日韩av一区二区高清不卡| 丁香社区五月在线视频久| 日韩在线中文字幕在线视频|